Project map
Everything a change can touch. Each object exists once; links say how they depend on each other.
Needs attention
No owner: CMP-03IF-03REQ-005REQ-007VER-04
Not linked to anything, so a change can never reach them: REQ-007
Objects
| ID | Type | Title | Owner | Status | Links |
|---|---|---|---|---|---|
| CMP-01 | component | Subsea accumulator bank | Emma | selected | 6 |
| CMP-02 | component | Directional control valve | Emma | selected | 3 |
| CMP-03 | component | Accumulator mounting bracket | missing | selected | 5 |
| CMP-04 | component | SCM control firmware | Nils | in development | 2 |
| DEC-01 | decision | Accumulator sizing basis | Emma | decided | 2 |
| DEC-02 | decision | Bracket orientation | Emma | decided | 1 |
| DOC-01 | document | SCM general arrangement drawing | Ingrid | released | 2 |
| DOC-02 | document | Accumulator datasheet | Emma | released | 1 |
| DOC-03 | document | Installation and operation manual | Lars | released | 1 |
| DOC-04 | document | Hydraulic schematic | Lars | released | 2 |
| IF-01 | interface | HPU to SCM hydraulic supply | Lars | agreed | 2 |
| IF-02 | interface | Accumulator to DCV hydraulic port | Emma | agreed | 2 |
| IF-03 | interface | Accumulator to bracket mechanical | missing | open | 2 |
| IF-04 | interface | Firmware to DCV solenoid command | Nils | agreed | 2 |
| REQ-001 | requirement | Fail-safe valve closure | Ingrid | allocated | 3 |
| REQ-002 | requirement | Usable accumulator volume | Emma | allocated | 3 |
| REQ-003 | requirement | Rated for design water depth | Ingrid | allocated | 2 |
| REQ-004 | requirement | Hydraulic fluid cleanliness | Lars | allocated | 1 |
| REQ-005 | requirement | Module mass within lift limit | missing | defined | 2 |
| REQ-006 | requirement | Gas-side-up mounting | Emma | allocated | 2 |
| REQ-007 | requirement | Accumulator pre-charge pressure | missing | identified | 0 |
| SUB-01 | system | Hydraulic power unit (topside) | Lars | baselined | 4 |
| SUB-02 | system | Subsea control module | Ingrid | baselined | 12 |
| SUB-03 | system | Production tree valve actuators | Lars | baselined | 2 |
| SYS-01 | system | Subsea production control system | Ingrid | baselined | 3 |
| VER-01 | verification | FAT valve close-time test | Ingrid | planned | 1 |
| VER-02 | verification | Accumulator drawdown test | Emma | passed | 1 |
| VER-03 | verification | Hyperbaric chamber test | Ingrid | planned | 1 |
| VER-04 | verification | Mounting orientation inspection | missing | planned | 1 |
| VER-05 | verification | Weight report | Lars | planned | 1 |